Exemplary Biogas and Biomethane Plants
High quality for a flawless operation
The materials we use have proven their reliability and resilience for years already. A further special feature which characterizes our biogas and biomethane plants is the possibility to process a large number of varied raw and residual substances.
Biogas plant BWM Dülmen
Plant characteristics:
- Biogas plants with 1400 Nm3/h biogas
- Biogas upgrading plant with 700 Nm³/h biomethan
- Planning, plant construction, gas processing as well as operation of biogas by revis bioenergy
- Processing of approx. 65,000 t of solid manure
- Construction time: 6 months
- Operation of the plant since spring 2020

Biogas plant Trebsen
Plant characteristics:
- Biogas upgrading plant with 550 Nm³/h biomethan
- Upgrading of the biogas from the anaerobic process water treatment of a paper mill
- Planning, plant construction, gas processing as well as operation of biogas by revis bioenergy
- Construction time 6 months
- Operation of plant since September 2018

Biogas plant + biomethane plant Gommern
Plant characteristics:
- Biogas plant 1 with 1400 Nm3/h biogas
- Biogas plant 1 with 700 Nm3/h biomethane
- Planning, plant construction, gas processing as well as operation of biogas by revis bioenergy
- Processing of approx. 50,000 t silage per year
- Capacity of silo system approx. 6,500 m2 sufficient for approx. 30,000 t (85% of the annual requirement)
- Biomass approx. 50,000 t renewable raw materials (maize, millet, grass, whole crop silage) from approx. 10 suppliers
- Construction time 6 months
- Operation of plant 1 since 4 May 2017
- Operation of plant 2 end of 2018
Biogas plant + biomethane plant I+II Oebisfelde
Plant characteristics:
- 2 biogas plants each with 1400 Nm3/h biogas
- Planning, plant construction, gas processing as well as operation (up until 2016) by revis bioenergy
- Processing of approx. 55,000 t silage per year
- Capacity of silo system approx. 15,000 m2 sufficient for approx. 48,000 t (85% of the annual requirement)
- Biomass approx. 55,000 t renewable raw materials (maize, millet, grass, whole crop silage) from approx. 10 suppliers
- Construction time 6 months
- Operation of plant 1 June 2013
- Operation of plant 2 June 2014
- Project sold
Biogas plant + biomethane plant I+II Satuelle
Plant characteristics:
- 2 biogas plants each with 1400 Nm3/h biogas
- Planning, plant construction, gas processing as well as operation (up until 2016) by revis bioenergy
- Processing of approx. 55,000 t silage per year
- Capacity of silo system approx. 15,000 m2 sufficient for approx. 48,000 t (85% of the annual requirement)
- Biomass approx. 55,000 t renewable raw materials (maize, millet, grass, whole crop silage) from approx. 10 suppliers
- Construction time 6 months
- Operation of biogas / biomethane plant 1 June 2013
- Operation of biogas / biomethane plant 2 June 2014
- Project sold
Biogas plant + biomethane plant Uchte
Plant characteristics:
- Biogas plants with 1400 Nm3/h biogas
- Planning, plant construction, biogas-biomethane processing by revis bioenergy on behalf of an external client
- Biomass approx. 35,000 t renewable raw materials
- Capacity of silo system sufficient for approx. 50,000 t (140% of the annual requirement– 35,000t)
- Container height approx. 17 m
- Construction time 6 months
- Commissioning of the biogas plant and the biomethane plant 2011
Trelder Berg Energy Park
Plant characteristics:
- 3 biogas plants with a total of 8 MW el. power
- Planning, construction, funding and operation by revis bioenergy
- Processing of approx. 85,000 t silage per year
- Approx. 75 farmers as suppliers
- Heat supply of the neighbouring wood pellet production
- Construction time 6 months
- In operation since the end of 2006
- Project sold
Film "Construction of a biogas-biomethane plant" by revis bioenergy GmbH
revis bioenergy GmbH phone: +49 251 - 609845-0
address
Lippstädter Straße 42
48155 Münstercontact
fax: +49 251 - 609845-22
info@revis-bioenergy.de
© 2023 revis bioenergy GmbH